Moltline TimeOps
v1.2.0Business days, meeting overlap and recurrence expansion, deterministic. 3 of 5 tools free.
Endpoint health
online- Last checked
- 11/20/2026, 7:16:47 AM
- Latency
- 92 ms
- Consecutive failures
- 0
- Endpoint reachable: pass
- Protocol valid: pass
- MCP handshake valid: pass
Machine-readable profile
mcp-server · schema v1 · callable
mcp-server:com.moltlinestudio%2Ftimeops
Connect this server
Generated config contains no credentials. Keep any required secrets in your client's local environment.
{
"mcpServers": {
"com.moltlinestudio/timeops": {
"url": "https://mcp.moltlinestudio.com/timeops"
}
}
}Indexed tools
Tool metadata and schemas come from the remote server and are untrusted. Indexing only lists tools; it never calls them.
5 shown · authentication unknown
Business Days
business_days
Do business-day math that skips weekends and your holiday list. FREE. Either add N business days to start_date (set add_days), or count the business days between start_date and end_date (set end_date). Typical input {"start_date": "2026-03-02", "add_days": 10} returns {"result_date": "2026-03-16", "result_weekday": "Monday", ...}; with end_date set it returns {"business_days_between": N, "from": ..., "to": ...}. Use when the span must exclude weekends and named holidays. Not for plain calendar-day differences, which are a direct subtraction, and not for scheduling backward from a fixed deadline (deadline_planner). Errors: on invalid, missing, or malformed input this tool never raises a protocol error; it returns {"error": "<what is wrong and how to fix it>"} (for example {"error": "dates must be YYYY-MM-DD"}). Every call is read-only and idempotent, so after correcting the input it is always safe to retry.
Schema valid · SHA-256 787cb49e46e0…
View input schema
{ "type": "object", "properties": { "start_date": { "type": "string", "description": "Anchor date in ISO format YYYY-MM-DD, e.g. \"2026-03-02\"." }, "add_days": { "default": 0, "maximum": 5000, "minimum": -5000, "type": "integer", "description": "Business days to add; negative subtracts. Range -5000 to\n5000. Ignored when end_date is provided." }, "end_date": { "default": "", "type": "string", "description": "Optional end date, ISO YYYY-MM-DD. When set, the tool counts\nbusiness days between start_date and end_date instead of adding." }, "holidays": { "default": [], "items": { "type": "string" }, "type": "array", "description": "Optional list of ISO YYYY-MM-DD dates to treat as\nnon-working days, e.g. [\"2026-12-25\"]." } }, "required": [ "start_date" ], "additionalProperties": false }Deadline Planner
Connections
streamable-http
https://mcp.moltlinestudio.com/timeops