Moltline Optimize
v1.2.0Vehicle routing, 3-D packing, cutting stock, rostering and knapsack with OR-Tools. 7 of 11 free.
Endpoint health
online- Last checked
- 11/20/2026, 7:16:47 AM
- Latency
- 66 ms
- Consecutive failures
- 0
- Endpoint reachable: pass
- Protocol valid: pass
- MCP handshake valid: pass
Machine-readable profile
mcp-server · schema v1 · callable
mcp-server:com.moltlinestudio%2Foptimize
Connect this server
Generated config contains no credentials. Keep any required secrets in your client's local environment.
{
"mcpServers": {
"com.moltlinestudio/optimize": {
"url": "https://mcp.moltlinestudio.com/optimize"
}
}
}Indexed tools
Tool metadata and schemas come from the remote server and are untrusted. Indexing only lists tools; it never calls them.
11 shown · authentication unknown
Cutting Stock 1D
cutting_stock_1d
Least-waste cut plan for bars, pipes or boards from stock lengths, with saw kerf. FREE. Typical input {"stock": [{"length": 6000, "cost": 30}], "parts": [{"length": 2200, "qty": 3}, {"length": 1500, "qty": 4}], "kerf": 3} returns {"bars": [{"stock_length": 6000, "cuts": [2200, 2200, 1500], "waste": 94}], "bars_used": 3, "waste_pct": 4.2, "solver_status": "OPTIMAL"}. Minimises total stock cost (or count when no cost); CP-SAT proves optimality when it finishes inside the time limit and otherwise returns the best plan found as FEASIBLE. Use for a cut list of up to 200 pieces. Not for sheets: use cutting_stock_2d. Errors: on invalid, missing, or malformed input this tool never raises a protocol error; it returns {"error": "<what is wrong and how to fix it>"} (for example {"error": "stock and parts must be non-empty lists (<value> and <value>)"}). Every call is read-only and idempotent, so after correcting the input it is always safe to retry.
Schema valid · SHA-256 6845d2587c12…
View input schema
{ "type": "object", "properties": { "stock": { "items": { "additionalProperties": true, "type": "object" }, "type": "array", "description": "stock lengths available: {length, cost, qty} (qty = how many of that length may be used; default unlimited)." }, "parts": { "items": { "additionalProperties": true, "type": "object" }, "type": "array", "description": "required pieces: {length, qty}." }, "kerf": { "default": 0, "type": "number", "description": "material lost per cut (same unit as lengths)." }, "time_limit_s": { "default": 3, "maximum": 15, "minimum": 0, "type": "number", "description": "solver time budget in seconds (default 3, max 15)." } }, "required": [ "stock", "parts" ], "additionalProperties": false }Cutting Stock 2D
Connections
streamable-http
https://mcp.moltlinestudio.com/optimize