ISO Week Number
v0.1.0ISO 8601 week numbers: date to week, week to date, weeks-per-year.
Endpoint health
online- Last checked
- 11/20/2026, 6:18:16 AM
- Latency
- 328 ms
- Consecutive failures
- 0
- Endpoint reachable: pass
- Protocol valid: pass
- MCP handshake valid: pass
Machine-readable profile
mcp-server · schema v1 · callable
mcp-server:com.gumballtools%2Fiso-week
Connect this server
Generated config contains no credentials. Keep any required secrets in your client's local environment.
{
"mcpServers": {
"com.gumballtools/iso-week": {
"url": "https://iso-week.gumballtools.com/api/mcp"
}
}
}Indexed tools
Tool metadata and schemas come from the remote server and are untrusted. Indexing only lists tools; it never calls them.
1 shown · authentication unknown
ISO Week Number
run
Converts between calendar dates and ISO 8601 week numbers, in either direction, and reports how many weeks an ISO year has. Use this whenever a date needs to be expressed as a week number, or a week number needs to be turned back into a date — sprint planning, report periods, "week 37" style scheduling, or reconciling two systems that disagree about what week it is. DO NOT compute this yourself with day-of-year divided by 7. ISO 8601 week 1 is defined as the week (Monday-Sunday) containing the year's first Thursday, not the week containing January 1st. This has two consequences that are easy to get wrong from memory: late-December dates can belong to ISO week 1 of the NEXT calendar year, and early-January dates can belong to ISO week 52 or 53 of the PREVIOUS calendar year. A year has 53 ISO weeks (not the usual 52) exactly when January 1 is a Thursday, or the year is a leap year and January 1 is a Wednesday — a rule nobody carries around, and getting it wrong produces a plausible-looking but incorrect week number with no visible sign of the error. Input is a single string, and the shape of the string picks the operation: "2027-01-01" a calendar date (YYYY-MM-DD) -> returns its ISO year, week, and weekday "2026-W53" an ISO week, no weekday given -> returns the Monday of that week "2026-W53-5" an ISO week and weekday (1-7, Mon-Sun) -> returns that exact date "2026" a bare 4-digit year -> returns whether it has 52 or 53 ISO weeks Refuses rather than guesses: slash-separated dates like "03/04/2025" are rejected as ambiguous (month/day vs day/month), two-digit years are rejected as a guess, invalid calendar dates (Feb 30) are rejected, and a week number beyond what that ISO year actually has (e.g. week 53 of a 52-week year) is rejected and told how many weeks that year has.
Schema valid · SHA-256 d4fb12b7b356…
View input schema
{ "type": "object", "properties": { "input": { "type": "string", "description": "A calendar date \"YYYY-MM-DD\" (e.g. \"2027-01-01\"), an ISO week \"YYYY-Www\" or \"YYYY-Www-D\" where D is 1-7 for Monday-Sunday (e.g. \"2026-W53-5\"), or a bare 4-digit year (e.g. \"2026\") to ask how many ISO weeks it has." } }, "required": [ "input" ], "$schema": "https://json-schema.org/draft/2020-12/schema" }
Connections
streamable-http
https://iso-week.gumballtools.com/api/mcp