DC Blueprint data-centre intelligence
v1.1.0Dated European data-centre markets, projects, grid connection limits, country rules and live grid.
Endpoint health
online- Last checked
- 11/20/2026, 7:15:35 AM
- Latency
- 431 ms
- Consecutive failures
- 0
- Endpoint reachable: pass
- Protocol valid: pass
- MCP handshake valid: pass
Machine-readable profile
mcp-server · schema v1 · callable
mcp-server:com.dcblueprint%2Fdata-centres
Connect this server
Generated config contains no credentials. Keep any required secrets in your client's local environment.
{
"mcpServers": {
"com.dcblueprint/data-centres": {
"url": "https://dcblueprint.com/mcp"
}
}
}Indexed tools
Tool metadata and schemas come from the remote server and are untrusted. Indexing only lists tools; it never calls them.
7 shown · authentication unknown
Data-centre business-case figures for one market
business_case_figures
The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff cost, guarding, property tax, exit yield, grid wait, permitting and grid charges, with low and high. Answers with no key: the market's build cost per MW with its low-to-high range, the date, the market page and its rank in the European Build Cost Index, free on every call. All figures need a personal DC Blueprint key (Authorization: Bearer) from an account with a DC Blueprint licence or trial. Ask for one market for the project at hand: every figure costs 5 credits, one figure (the "figure" argument) 1; the same answer again in the calendar month costs nothing. It is not a way to copy the catalogue market by market. Markets: Amsterdam, Athens, Barcelona, Berlin, Bristol, Brussels, Central Scotland, Copenhagen, Dublin, Frankfurt, Helsinki, Lille, Lisbon, London, Lyon, Madrid, Marseille, Milan, Munich, Oslo, Paris, Prague, Rhineland, Rome, Stockholm, Vienna, Warsaw, Zagreb, Zaragoza, Zurich. Figures: Construction cost, Colocation price, retail, Colocation price, wholesale, Colocation price, large deals, Electricity price, Cost of a site employee, Guarding and monitoring, Property tax, Exit yield, Wait for a grid connection, Permitting, Grid connection charge, Customer substation. Each figure carries its trust level (high, medium or low).
Schema valid · SHA-256 402a80de1c6a…
View input schema
{ "type": "object", "properties": { "market": { "type": "string", "description": "A business-case market, e.g. \"Frankfurt\", \"Milan\"." }, "figure": { "type": "string", "description": "Optional: one figure only, e.g. \"Construction cost\" or \"Exit yield\" (1 credit). Leave it out for every figure of the market." } }, "required": [ "market" ] }
Connections
streamable-http
https://dcblueprint.com/mcp