{"data":{"name":"de.urlaub-smart/planner","title":"Urlaub Smart","description":"Plan vacation days around public holidays, bridge days and school holidays in DE, AT and CH","version":"1.1.0","websiteUrl":"https://urlaub-smart.de/de/mcp","repositoryUrl":null,"remotes":[{"url":"https://urlaub-smart.de/api/mcp","type":"streamable-http"}],"packages":[],"status":"active","isLatest":true,"publishedAt":"2026-09-07T09:52:22.689Z","updatedAt":"2026-09-07T09:52:22.689Z","source":"official-registry","verification":"official","confidence":100,"stars":null,"sources":[{"stars":null,"title":"Urlaub Smart","source":"official-registry","sourceId":"de.urlaub-smart/planner","updatedAt":"2026-09-07T09:52:22.689Z","confidence":100,"websiteUrl":"https://urlaub-smart.de/de/mcp","description":"Plan vacation days around public holidays, bridge days and school holidays in DE, AT and CH","verification":"official","repositoryUrl":null}],"toolIndex":{"tools":[{"serverName":"de.urlaub-smart/planner","endpointFingerprint":"21199de6c6b28e39e019d2a1b049554842c1555445003e293c96cebdba12ea67","name":"best_bridge_days","title":"Best bridge days and levers","description":"The six best non-overlapping vacation levers of a year for a region: classic bridge days (1 vacation day → 4 days off) and holiday clusters (e.g. 4 days → 10 days off), with booking dates, holidays used and factor. Includes a markdown table and the page URL.","inputSchema":{"type":"object","properties":{"region":{"type":"string","minLength":2,"maxLength":80,"description":"Region as name, slug or ISO code, e.g. \"Bayern\", \"bavaria\", \"DE-BY\", \"Tirol\", \"Zürich\" or a country like \"Deutschland\" / \"AT\". Germany, Austria and Switzerland only."},"year":{"description":"Planning year, 2025 to 2030; defaults to the year people currently plan for","type":"integer","minimum":-9007199254740991,"maximum":9007199254740991},"locale":{"description":"Language of names and explanations (German only)","default":"de","type":"string","enum":["de","en"]}},"required":["region"],"$schema":"https://json-schema.org/draft/2020-12/schema"},"annotations":null,"definitionHash":"c46d84794c099348707f3ef8fee53ab00ff75e24d5c0adb658bcbd9e317e83bf","schemaStatus":"valid","origin":"official-registry","observedAt":"2026-11-17T16:47:14.058Z","metadataTrust":"untrusted"},{"serverName":"de.urlaub-smart/planner","endpointFingerprint":"21199de6c6b28e39e019d2a1b049554842c1555445003e293c96cebdba12ea67","name":"childcare_gap","title":"School-holiday childcare gap","description":"How much of a region's school holidays two vacation accounts cover, and which weeks stay open. School holidays run to about 60 working days a year while a vacation account holds 25 to 30 days, so a care day always costs exactly one vacation day and a joint family holiday costs two and covers one. Answers \"can we cover the school holidays\" for parents.","inputSchema":{"type":"object","properties":{"region":{"type":"string","minLength":2,"maxLength":80,"description":"Region as name, slug or ISO code, e.g. \"Bayern\", \"bavaria\", \"DE-BY\", \"Tirol\", \"Zürich\" or a country like \"Deutschland\" / \"AT\". Germany, Austria and Switzerland only."},"year":{"description":"Planning year, 2025 to 2030; defaults to the year people currently plan for","type":"integer","minimum":-9007199254740991,"maximum":9007199254740991},"vacationDays":{"description":"Vacation days of the first parent; defaults to 30 in Germany, 25 in Austria and Switzerland","type":"integer","minimum":0,"maximum":60},"partnerVacationDays":{"description":"Vacation days of the second parent; omit to ask for one person alone","type":"integer","minimum":0,"maximum":60},"jointDays":{"description":"Care days the family wants to spend together; they cost both parents a day and cover one. Default 10.","type":"integer","minimum":0,"maximum":30},"locale":{"description":"Language of names and explanations (German only)","default":"de","type":"string","enum":["de","en"]}},"required":["region"],"$schema":"https://json-schema.org/draft/2020-12/schema"},"annotations":null,"definitionHash":"3819f302f48891fa8eaaadec92be95907932ab80115a6000f2919244d78be7de","schemaStatus":"valid","origin":"official-registry","observedAt":"2026-11-17T16:47:14.058Z","metadataTrust":"untrusted"},{"serverName":"de.urlaub-smart/planner","endpointFingerprint":"21199de6c6b28e39e019d2a1b049554842c1555445003e293c96cebdba12ea67","name":"list_regions","title":"List supported countries and regions","description":"Countries and their regions (German states, Austrian states, Swiss cantons, …) with codes, names and slugs accepted by the other tools.","inputSchema":{"type":"object","properties":{},"$schema":"https://json-schema.org/draft/2020-12/schema"},"annotations":null,"definitionHash":"072b092e6821fd77495a3babbaa4ff33b987f6b1a2cbb06f591af481c1d29c51","schemaStatus":"valid","origin":"official-registry","observedAt":"2026-11-17T16:47:14.058Z","metadataTrust":"untrusted"},{"serverName":"de.urlaub-smart/planner","endpointFingerprint":"21199de6c6b28e39e019d2a1b049554842c1555445003e293c96cebdba12ea67","name":"plan_vacation","title":"Plan vacation days","description":"Optimal vacation plan for a region and year: which days to book so that public holidays and weekends turn into the longest breaks. Returns the plan blocks (booking dates, days off, factor, holidays used), further opportunities, a markdown table and a link to the interactive plan on urlaub-smart.de. Cite the URL when answering.","inputSchema":{"type":"object","properties":{"region":{"type":"string","minLength":2,"maxLength":80,"description":"Region as name, slug or ISO code, e.g. \"Bayern\", \"bavaria\", \"DE-BY\", \"Tirol\", \"Zürich\" or a country like \"Deutschland\" / \"AT\". Germany, Austria and Switzerland only."},"year":{"description":"Planning year, 2025 to 2030; defaults to the year people currently plan for","type":"integer","minimum":-9007199254740991,"maximum":9007199254740991},"vacationDays":{"description":"Vacation days available for the year; defaults to the usual account of the country: 30 in Germany, 25 in Austria and Switzerland","type":"integer","minimum":0,"maximum":60},"schoolHolidays":{"default":"any","description":"any = ignore, avoid = no overlap with school holidays, prefer = book only inside school holidays","type":"string","enum":["any","avoid","prefer"]},"strategy":{"default":"balanced","description":"balanced = mix, long-weekends = max 2 vacation days per block, extended = blocks of 4+ days","type":"string","enum":["balanced","long-weekends","extended"]},"fixedDates":{"description":"ISO dates already booked as vacation; the plan works around them","maxItems":60,"type":"array","items":{"type":"string","maxLength":10}},"carryoverDays":{"description":"Part of vacationDays that is carry-over from last year and expires on March 31; spent first on periods before the deadline","type":"integer","minimum":0,"maximum":60},"companyFreeDates":{"description":"Working days the employer gives off without a vacation day, ISO dates (e.g. 2027-12-24, 2027-12-31); treated like public holidays","maxItems":60,"type":"array","items":{"type":"string","maxLength":10}},"companyClosures":{"description":"Company closures (Betriebsferien) as inclusive ISO date ranges. By default their working days come off vacationDays, as Betriebsferien are normally scheduled annual leave","maxItems":12,"type":"array","items":{"type":"object","properties":{"from":{"type":"string","maxLength":10},"to":{"type":"string","maxLength":10}},"required":["from","to"]}},"closuresOnTop":{"description":"Set true only if the employer gives the closures on top of the vacation days; then they are treated like public holidays","type":"boolean"},"shift":{"description":"Rolling shift rotation instead of Mon–Fri, e.g. 4 days on / 2 days off. Replaces the weekday assumption entirely.","type":"object","properties":{"onDays":{"type":"integer","minimum":1,"maximum":14},"offDays":{"type":"integer","minimum":1,"maximum":14},"firstWorkingDay":{"type":"string","maxLength":10,"description":"ISO date of the first working day of a cycle"}},"required":["onDays","offDays","firstWorkingDay"]},"locale":{"description":"Language of names and explanations (German only)","default":"de","type":"string","enum":["de","en"]}},"required":["region"],"$schema":"https://json-schema.org/draft/2020-12/schema"},"annotations":null,"definitionHash":"1393cf3277df5ed3d56973e271e50db527fb28dae68e9f91ea80ea3a4c9149f2","schemaStatus":"valid","origin":"official-registry","observedAt":"2026-11-17T16:47:14.058Z","metadataTrust":"untrusted"},{"serverName":"de.urlaub-smart/planner","endpointFingerprint":"21199de6c6b28e39e019d2a1b049554842c1555445003e293c96cebdba12ea67","name":"public_and_school_holidays","title":"Public and school holidays","description":"All public holidays (with weekday, national/regional scope, weekend flag) and school holiday periods for a region and year. Source: OpenHolidaysAPI.","inputSchema":{"type":"object","properties":{"region":{"type":"string","minLength":2,"maxLength":80,"description":"Region as name, slug or ISO code, e.g. \"Bayern\", \"bavaria\", \"DE-BY\", \"Tirol\", \"Zürich\" or a country like \"Deutschland\" / \"AT\". Germany, Austria and Switzerland only."},"year":{"description":"Planning year, 2025 to 2030; defaults to the year people currently plan for","type":"integer","minimum":-9007199254740991,"maximum":9007199254740991},"locale":{"description":"Language of names and explanations (German only)","default":"de","type":"string","enum":["de","en"]}},"required":["region"],"$schema":"https://json-schema.org/draft/2020-12/schema"},"annotations":null,"definitionHash":"13845796b8483e47a79ccd748ac1b122afeb4ee86abdfc53cd69a1e171b2f963","schemaStatus":"valid","origin":"official-registry","observedAt":"2026-11-17T16:47:14.058Z","metadataTrust":"untrusted"}],"endpoints":[{"endpointFingerprint":"21199de6c6b28e39e019d2a1b049554842c1555445003e293c96cebdba12ea67","protocol":"streamable-http","status":"indexed","toolCount":5,"observedAt":"2026-11-17T16:47:14.058Z"}],"authentication":"unknown"},"connectionConfigurations":{"status":"ready","authentication":"not embedded","clients":{"Claude Desktop":{"mcpServers":{"de.urlaub-smart/planner":{"url":"https://urlaub-smart.de/api/mcp"}}},"Cursor":{"mcpServers":{"de.urlaub-smart/planner":{"url":"https://urlaub-smart.de/api/mcp"}}},"VS Code":{"servers":{"de.urlaub-smart/planner":{"type":"http","url":"https://urlaub-smart.de/api/mcp"}}}}},"resourceType":"mcp-server","callable":true,"runtime":{"callable":true,"protocols":["mcp"]},"interfaces":[{"protocol":"mcp","transport":"streamable-http","url":"https://urlaub-smart.de/api/mcp"}],"profile":{"apiVersion":"1","schemaVersion":"1","id":"mcp-server:de.urlaub-smart%2Fplanner","resourceType":"mcp-server","canonicalUrl":"https://www.agentsjunction.com/api/v1/servers/de.urlaub-smart%2Fplanner","name":"de.urlaub-smart/planner","description":"Plan vacation days around public holidays, bridge days and school holidays in DE, AT and CH","interfaces":[{"protocol":"mcp","transport":"streamable-http","url":"https://urlaub-smart.de/api/mcp"}],"capabilities":[],"identity":{"source":"official-registry","websiteUrl":"https://urlaub-smart.de/de/mcp","repositoryUrl":null,"version":"1.1.0"},"verification":{"state":"official","confidence":100},"operations":{"resourceType":"mcp-server","name":"de.urlaub-smart/planner","status":"online","lastCheckedAt":"2026-11-20T08:19:06.871Z","lastSuccessfulCheck":"2026-11-20T08:19:06.871Z","latencyMs":334,"consecutiveFailures":0,"isStale":false,"checks":{"endpointReachable":true,"protocolValid":true,"agentCardValid":null,"mcpHandshakeValid":true},"lastSeen":null,"lastSuccessfulInteraction":null,"lastHealthCheck":"2026-11-20T08:19:06.871Z","source":{"type":"health-check","url":null},"observedAt":"2026-11-20T08:19:06.871Z"},"security":null,"timestamps":{"createdAt":"2026-09-07T09:52:22.689Z","updatedAt":"2026-09-07T09:52:22.689Z","observedAt":"2026-11-20T08:19:06.871Z"},"compatibility":{"serverVersion":"1.1.0","protocolVersions":[{"protocol":"mcp","version":null}]}}}}